The Murrumbidgee catchment covers 81,527 square kilometres and includes 26 storage or diversion structures, 1,690 kilometres of the river, and the surrounding wetlands. The climate conditions range from alpine in the Snowy Mountains to semi-arid on the Riverina plains.
Wetlands throughout the Murrumbidgee support threatened species listed under the Commonwealth Environment Protection and Biodiversity Conservation Act 1999 and NSW Biodiversity Conservation Act 2016.
The Traditional Owners of the Murrumbidgee are the Barapa Barapa, Mutthi Mutthi, Nari Nari, Ngarigo, Ngunnawal, Nyeri Nyeri, Wadi Wadi, Wolgalu, Wamba Wamba, Weki Weki and Wiradjuri Nations.
Water for rivers and wetlands
During 2021–22, the Department of Climate Change, Energy, the Environment and Water (the department) worked with the Commonwealth Environmental Water Holder to capitalise on wet conditions across the catchment to deliver water for the environment to sites including the Gayini Wetlands and instream Murrumbidgee River and Yanco Creek. Water was also used to benefit wetland habitats in the Murrumbidgee and Coleambally irrigation areas as well as the North Redbank wetlands, Forest Creek and Wanganella Swamp.
In 2022–23 managed watering events will initially focus on maintaining permanent water habitat for southern bell frogs, native fish, waterbirds and other aquatic species.
Water managers plan to supplement existing system flows to provide the maximum benefit to plants and animals. Watering events will aim to restore a more natural flow pattern to support a robust food web and other system functions. Water managers will ensure essential connections between the river and floodplain wetlands to aid in the movement of essential nutrients and native fish.
Weather and water forecast
The El Niño–Southern Oscillation (ENSO1) outlook remains at La Nina, with a return to neutral ENSO during winter. The Bureau of Meteorology issued an outlook in April 2022 which forecasts above median rainfall for May to July 2022 for eastern mainland Australia, with the chance of exceeding median rainfall stated as greater than 80%.
Indicative starting allocations are 95% for high security and 35% for general security licences. Water management plans reflect these wetter conditions and are mindful of the favourable starting allocations and high carryover.
Water managers have prepared watering plans that consider a range of weather and water availability scenarios in case it rains more or less than expected. This is known as resource availability scenario planning. ‘Moderate to wet’ conditions are forecast for the Murrumbidgee catchment in 2022–23.
1. ENSO: The interaction between the sea surface and atmosphere over the Pacific Ocean which results in dryer or wetter conditions (El Nino or La Nina).
Resource availability scenario
Current forecast: Moderate to wet
Conditions | Main aim | Other aims |
---|---|---|
Very dry | Protect | Avoid critical loss Maintain key refuges Avoid catastrophic events |
Dry | Maintain | Maintain river functioning Maintain key functions of high priority wetlands |
Moderate | Recover | Improve ecological health and resilience Improve opportunities for plants and animals to breed, move and thrive |
Wet to very wet | Enhance | Restore key floodplain and wetland linkages Enhance opportunities for plants and animals to breed, move and thrive |
Key planned actions for 2022–23
Waterbirds
Water managers have planned flows up to 200 gigalitres (GL) to provide foraging and breeding habitat for waterbirds, turtles, frogs and other aquatic species in core areas of Yanga National Park, Gayini and the North Redbank wetlands. Flows will water key Australasian bittern habitats in the Murrumbidgee and Coleambally irrigation areas and Yanco Creek systems.
Native fish
Water management plans allow for flows up to 100 GL to maintain instream and deep water off-stream habitats for native fish and to restore a more natural flow pattern to support native fish populations.
Vegetation
Water managers will provide 10 GL of water for the environment via pumping to key mid-Murrumbidgee and Yanco/Forest Creek sites currently out of reach of river flows, e.g. Willbriggie Lagoon, Wanganella Swamp and Rhyola Swamps.
Connectivity
Water managers have planned post airspace release and/or tributary event recession management flows up to 140 GL to inundate hundreds of mid-Murrumbidgee wetlands and the Lowbidgee lakes, while removing the effects of 3 weirs within the lower Murrumbidgee river channel and maximising fish passage (assuming reasonable starting allocations).
Map of proposed annual priority targets in the Murrumbidgee Water Resource Plan area 2022–23
The department is supporting the health and resilience of rivers and wetlands by delivering water for the environment where and when it is needed. We use the best available science, management expertise and experience to manage water across the landscape. This statement of annual priorities identifies the waterways and wetlands that are likely to receive water.
Our decision-making process considers:
- expected availability of water in the coming year
- conditions of the previous year
- current health of the plants and animals in these ecosystems.
Community-based Environmental Water Advisory Groups (EWAGs) provide feedback and advice to the department on the management of water for the environment.
The NSW Government works with the Commonwealth Environmental Water Holder to manage water in the catchment.
Water for the environment is a share of the water in dams and rivers that is set aside to support the long-term health of local rivers, creeks and wetlands. Healthy rivers carry water to homes, farms, schools and businesses. Rivers and wetlands are important cultural and spiritual sites for Aboriginal people, as well as the broader community.
Planned environmental water
Source | Maximum volume available (gigalitres) | Volume expected 1 July under current conditions (gigalitres) |
---|---|---|
Environmental Water Allowance (1) | 100 GL Linked to announced general security allocations | 53.1 GL |
Environmental Water Allowance (2) | Triggered by Burrinjuck Dam inflows and releases | 26 GL |
Environmental Water Allowance (3) | Linked to announced general security allocations | 0 GL |
Water licenced to New South Wales
Source | Maximum volume available (gigalitres) | Volume expected 1 July under current conditions (gigalitres) |
---|---|---|
General security | 31.4 GL | 7.85 GL new allocation, approx. 9.4 carryover |
Supplementary | 6.7 GL | Dependent on surplus flows |
Lowbidgee supplementary access licence (South Redbank/Yanga) | 148 GL | Dependent on surplus flows |
Water licenced to New South Wales
Source | Maximum volume available (gigalitres) | Volume expected 1 July under current conditions (gigalitres) |
---|---|---|
General security | 31.4 GL | 7.85 GL new allocation, approx. 9.4 carryover |
Supplementary | 6.7 GL | Dependent on surplus flows |
Lowbidgee supplementary access licence (South Redbank/Yanga) | 148 GL | Dependent on surplus flows |
Water licenced to the Commonwealth
Source | Maximum volume available (gigalitres) | Volume expected 1 July under current conditions (gigalitres) |
---|---|---|
High security | 14.2 GL | Up to 13.5 GL |
General security | 286.5 GL | 167.8 GL |
Conveyance | 50.3 GL | 37.7 GL |
Supplementary | 22 GL | Dependent on surplus flows from unregulated tributaries |
Lowbidgee supplementary | 406.6 GL | Dependent on surplus flows |
Notes: This is an indicative summary of expected volumes to be available. For further detail and information on available volumes you can contact the region via the Department of Climate Change, Energy, the Environment and Water on 1300 361 967.
1 gigalitre = 1000 megalitres; 2.5 megalitre = 1 Olympic swimming pool.
More about...
- Long-term water plans
- Murrumbidgee Long-Term Water Plan
- Water Sharing Plan for the Murrumbidgee Regulated River Water Sourceopens a new window
- Murray Darling Basin Authorityopens a new window
- Murray Darling Basin Planopens a new window
- Commonwealth Environmental Water Office – Murrumbidgeeopens a new window
More information on planned and past watering events
- Murrumbidgee Catchment – Water for the Environment: Annual Priorities 2021–22
- Murrumbidgee catchment: Annual environmental watering priorities 2020-21
- Murrumbidgee: Annual environmental watering priorities 2019-20
- Murrumbidgee catchment: Annual Environmental Watering Priorities 2018-19
- Murrumbidgee catchment: Annual environmental watering priorities 2017-18
- Murrumbidgee Water Resource Plan Area: Statement of annual environmental watering priorities 2016–17
- Murrumbidgee Water Resource Plan Area: Statement of annual environmental watering priorities 2015–16
- Vegetation Mapping Project: Executive summary - NSW Rivers Environmental Restoration Program
- Water for environment outcomes 2021-22
- Use of water for the environment in NSW: Outcomes 2020–21
- Use of water for the environment in NSW: Outcomes 2019–20
- Use of water for the environment in NSW: Outcomes 2018–19
- Use of water for the environment in NSW: Outcomes 2017–18